Lake Anne West 2/7/2018· Sub-surface flow is expected in low flow conditions until voids are filled· Bridge piers installed for downstream bridge (LAW-02) Tuesday 2/6/18· Oak tree at tributary 2 made safe with crown removal completed Tuesday 2/6/18· TDS punch list itemso Stabilize around upstream headwall STA 10+00.00 with A1 Rip Rapo Cut white pipe back to banko Install pipes under trail at Tributary 1· TCOT planting access with gator/cart· Tentative schedule for completion by the end of February:
Thursday 2/8/2018 Lower pedestrian bridge (LAW-02) installation Friday 2/9/2018 Construction entrance removal Monday 2/12/2018 Upper pedestrian bridge (LAW-02) installation Thursday 2/15/2018 Paving* Monday 2/19/2018 Planting*Final asphalt when daytime temps stay above 45° F, towardsend of next week. Paving will be accessed from upstream Bachan Ct.
Maintaining current contact information helps the board and its
committees reach owners and tenants with important board announcements
as well as during emergency events such as a water/gas main break or to
report storm damage to vehicles or other property. Each owner
and paying tenant should complete a separate form.
Non-resident owners should enter their address at the end of the
form. Note: You do NOT need to have a Google account in order
to update and submit the form.
!doctype>